|
The Methuen facility incorporates several high-density storage and file rooms with a minimum of 125 PSF floor live load. An integrated rolling file system required that the modular floor system be very rigid. CBSI utilized direct application of double 3/4-inch plywood flooring to the steel chassis cross-members, to obtain the required floor live loads. |